Lakeway Village WWTF


Met with Jason from McClanahan this morning at the WWTF to let him in and looked at the piping that needs fixed. He will leave to go get parts and then be back to work on the #2 Bed this AM. 
10:00am- pipes have been cut and as you can clearly see the valve was glued to header on an angle causing pipe run to “bow” up. 


11:00am- This is after one pipe was cut and as you can see again the run was just too long to begin with. A section will be cut out and coupling installed. 
Two 45* bends are used on two runs to get pipe back down due to valve angle. 

12:30pm- Bed #2 is now fixed and lines re-buried. 