Crew to pour UV structure today.
11:20am- UV structure is now poured. Crew continues to work inside tanks today to get piping in place and grouted into walls at pass throughs.
4:15pm- pipe and Tees are now installed through walls in the septic tanks.
Crew continues with pump piping installation inside of recirculation tanks at this time.
5:00pm- end of the day.