Tuesday, November 7, 2017

Lakeway Village WWTF


Hopper is loaded at this time to begin the day. 

More distribution piping to be installed on filter 2. 

12:07pm- filter media now in place. Crew has applied extra gravel to allow for burial of distribution pipe. 



5:25pm- The water main was located today, but unfortunately was broke in the process. It is now fixed at this time and pressure restored to the water system. 

Filter beds are also leveled up at this time and distribution piping will be installed once water line is ran and meter placed along with backflow device. 