Distribution pipe on filter 2 will be rest and f the way installed today.
Water line, meter and backflow to be installed today. I’ve asked for meter to be on “plant” side of roadway.
11:45am- piping on filter bed 2 begins installation.
Water line, meter, hydrants and backflow are now installed.
4:30pm- header piping now getting installed in filter1.
No comments:
Post a Comment