Thursday, November 9, 2017

Lakeway Village WWTF


Distribution pipe on filter 2 will be rest and f the way installed today. 

Water line, meter and backflow to be installed today. I’ve asked for meter to be on “plant” side of roadway. 

11:45am- piping on filter bed 2 begins installation. 

Water line, meter, hydrants and backflow are now installed. 



4:30pm- header piping now getting installed in filter1. 